SrpskiEnglishEspFraRus

Home

Introduction

SF Constructions

SF Elements

Examples

Prospect

Gallery

Contact


Examples...

Multi building public building with StiroFert
girder grill construction with grid axis (8m, 10m, 12m or even 15m)






  • It has small mass
    and it is very rigid,
    so it is highly recommended
    for areas with earthquakes
  • With no harmful effects for health
  • fire resistant
  • Prefabricated floor construction, economically proved
Cotter, profile built in during concreting
Cotter, profile built in during concreting. Cutter can be seen at the lower side of construction and it points the place when shorts is built in the process of mounting..


Details of construction used for mounting gypsum plates Details of construction used for mounting gypsum plates. Core plates are built in during concreting, one side of galvanized „L“ profiles are set on cores, notched in polystyrene, while other, horizontal side is used for mounting gypsum plates. There is an other whey. You can use plastic net and polystyrene glue.


StiroFert power-saving intermediate floor constructions:

    Power-saving intermediate floor constructions
  • for fast mounting with less or even no shoring
  • for greater spans (up to 12 meters)
  • for higher bearing capacity (up to 15 kN/m2 of work load)
  • for safer building, thanks to small mass of it
  • for saving energy (k<0,3 W/m2 oC),
  • for public, industrial buildings and family houses with one or more floors
  • for super structures, with no alternatives
  • for static systems: single-span beams, continual girders, girder grills, vaults
StiroFert constructions are concreted with pumps with or without vibrations and surface treatments.



Public building with suites
in Sv.Sava piateau in Belgrade
The building in Subotica
super structured with StiroFert construction.